Summary · why it matters
Eagle Plains Resources Ltd. and partner Xcite Uranium Inc. reported additional drilling results from the Don Lake uranium project near Uranium City, Saskatchewan, where the B Zone and C Zone targets intersected multiple zones of anomalous radioactivity. The 1106m, 10-hole program, contracted to Apex Drilling, tested for structurally-controlled uranium mineralization defined by historical work and the 2025-2026 field programs. Highlights included DN26005 with 1.3m averaging 2898 cps, DN26006 with 5.5m averaging 2656 cps, DN26008 with 0.7m averaging 10403 cps, and DN26009 with 0.6m averaging 12473 cps. The first three holes at Don Lake in 2026, completed in the A Zone area, also intersected anomalous radioactivity, including DN26001 with 1.9m averaging 11571 cps, DN26002 with 1.1m averaging 11753 cps, and DN26003 with 1.2m averaging 2700 cps. Geochemical assays of drill core samples are pending, and the approved 2026 budget for Don Lake is approximately $1.1 million, consisting of $200,000 in completed fieldwork and $900,000 allocated for drilling, with all work managed by TerraLogic Exploration Inc. Under a December 2023 agreement, Xcite holds the exclusive right to earn up to an 80% interest in the Don Lake, Gulch, Lorado, Beaver River, Black Bay, and Smitty projects, which cover 54 Saskatchewan Mineral Deposit Index occurrences and five past-producing uranium mines and are 100% owned by Eagle Plains.