First Majestic Silver CorpReceived construction permits for new portals, enabling future silver/gold production and extending mine life.

First Majestic Silver has received the permits required to construct the Santo Niño and Navidad portals at its Santa Elena Silver/Gold Mine in Sonora, Mexico, and plans to invest an additional $12 million in 2026 to advance underground access and position Santo Niño for near-term mining. Infill drilling at both targets returned multiple significant silver and gold intercepts, including high-grade results from resource-conversion drilling, with results overall better than modeled and confirming higher-grade mineralization in the western portion of the Santo Niño vein. The 2026 drilling program at Santo Niño has completed 26,904 metres across 69 holes as part of a planned 45,000-metre program, while drilling at Navidad has completed 7,704 metres across 10 holes as part of a planned 17,000-metre program. The additional $12 million investment will support portal construction, hydrogeological studies, a haul road linking the Santo Niño portal to the Ermitaño haul road, approximately 800 metres of decline development at Santo Niño, and an additional 1,300 metres of development in the Ermitaño-to-Navidad ramp and from the Navidad portal. Together, Santo Niño and Navidad are expected to become important contributors to the future mine plan and have the potential to materially extend Santa Elena's mine life.
First Majestic Silver CorpReceived construction permits for new portals, enabling future silver/gold production and extending mine life.