Goldgroup Mining Inc.High-grade drill results support potential mine restart.

Goldgroup Mining Inc. has announced assay results from the first six drillholes of its ongoing 26,000-metre diamond drilling program at the San Francisco Gold Project in Sonora, Mexico, with high-grade intervals highlighting the project's potential and supporting work toward a possible restart. Notable intercepts include 23.4 metres grading 1.71 g/t gold in hole GGD-174, and 16.8 metres grading 4.36 g/t gold in GGD-178, which also returned a second interval of 10.0 metres grading 2.00 g/t gold. The company plans to incorporate these results into its geological and resource models to support a detailed technical study evaluating a potential restart and optimization of the formerly producing mine. Goldgroup has budgeted approximately US$8.5 million for the drilling program and expects the broader technical study to be completed in Q4 2026, with a possible restart in Q1 2027. CEO Javier Reyes said the results are a highly encouraging start and reinforce the belief that significant value can be unlocked from the established project.
Goldgroup Mining Inc.High-grade drill results support potential mine restart.
OK Rusal MKPAO