Kinross Gold CorporationKinross reported gold mineralization in every Phase 1 hole at Dixie Halo, up to 6 g/t gold, and will start Phase 2 drilling

Kinross Gold Corporation has reported gold mineralization in every hole of its 2026 Phase 1 drill program at BTU Metals Corp.'s optioned Dixie Halo properties in Red Lake, Ontario, with values ranging from less than 1 g/t gold up to 6 g/t gold. The eight holes totaled 4,528.5 metres and focused on the eastern TNT area of the property, where drilling also intersected copper mineralization from trace levels up to 0.530% copper and 8.22 g/t silver over a 16-metre drilled interval. Hole BTU-26-15 returned individual high copper values of 8.41% copper and 116 g/t silver over 0.4 metres, and 3.9% copper and 71.8 g/t silver, along with a 24.55-metre drilled interval grading 0.626% copper and 12.61 g/t silver. Kinross, which can earn a 70% interest in the Dixie Halo project under its option agreement, has indicated it will begin Phase 2 of the 2026 drill program later this year once equipment and technical personnel are available, with targets expected to focus on the TNT area. Separately, BTU Metals said it has sourced a drill contractor for an approximately 1,200-metre program at its Hubcap and Centennial areas in the Wawa gold district and expects to mobilize and commence drilling in September.
Kinross Gold CorporationKinross reported gold mineralization in every Phase 1 hole at Dixie Halo, up to 6 g/t gold, and will start Phase 2 drilling
Peabody Energy CorpBTU Metals' optioned Dixie Halo property yielded gold and high-grade copper/silver intercepts, and it sourced a drill contractor for its Wawa program