KJL expands into Data Center and Solar markets, targets 10-15% revenue growth in 2026

IndustryProduct / TechAnalyst
โดย HoonVision·TH·Read original
Summary · why it matters

Kijcharoen Engineering Electric Public Company Limited, or KJL, is pressing ahead with business expansion to capture opportunities in the Data Center and Solar Rooftop markets. Chief Executive Officer Kasemsan Sujiwarodom told the Stock Vision news team that the company has raised production capacity from approximately 33 million units to 40 million units in 2026, while the current capacity utilisation rate stands at around 70-80%, leaving room to handle expected increases in orders without the need for major immediate investment. The company is developing new products for the Data Center market, including server rack cabinets, cable trays, cable ladders, cable management systems, and electrical distribution and control panels, or switchboards, which will be rolled out gradually with revenue recognition beginning from 2027 onward. On the marketing front, KJL is expanding its KJL Network, aiming to grow its network of electrical engineers, electricians, and designers from approximately 15,000 people at present to 30,000 people within this year. As for the operating outlook, the company is confident that 2026 will meet its growth target, with revenue projected to grow by around 10-15% compared with the previous year, after business began to improve gradually from the second quarter of 2026, and it expects continued growth in the second half of the year.

Impact on stocks 1

Energy Transition & Power Demand · 1 stocks
Kijcharoen Engineering Electric PCL
KJL
▲ PositiveDemandSupplyrelevance

KJL is expanding into Data Center and Solar Rooftop markets with new products and growing its engineer network, targeting 10-15% revenue growth in 2026.

Theme Impact 1

Related news

impact 4

GE Vernova Settles Vineyard Wind Dispute as GE Aerospace Buys Consolidated Precision Products

General Electric's GE Vernova unit has resolved its legal dispute with Vineyard Wind, while GE Aerospace has addressed a GE9X engine durability issue and announced an US$11.75 billion acquisition of Consolidated Precision Products to bolster precision-cast engine component supplies. The Vineyard Wind settlement trims legal overhang at GE Vernova, and the planned US$11.75 billion CPP acquisition directly targets one of GE Aerospace's largest current vulnerabilities, precision component availability, by bringing more casting capacity in house to support engine production schedules and protect margins around key catalysts such as the GE9X and GEnx ramp. General Electric's narrative projects $63.2 billion revenue and $11.7 billion earnings by 2029, requiring 7.7% yearly revenue growth and about a $2.7 billion earnings increase from $9.0 billion today, and the narrative yields a $404.90 fair value, a 29% upside to its current price. Some of the lowest ranked analysts assume revenue of about US$60.8 billion and earnings of roughly US$10.8 billion by 2029 while applying a lower price target. Investors still need to weigh the unresolved execution risk around GE9X and broader supply chain pressures.
Simply Wall St·6hRead more →

Kasikorn Securities flags ESG as turning point for Thai stock profits, names 10 beneficiaries

Kasikorn Securities, or KS, said in a research note that ESG is entering an era in which it genuinely affects financial outcomes, and unveiled 10 stocks set to benefit from the ESG transition. The Stock Exchange of Thailand is preparing to move from SET ESG Ratings to the FTSE Russell ESG Scores framework, with listed companies due to learn their own scores in 2026 and public disclosure beginning in 2027. Preliminary statistics from the 2025 FTSE Russell ESG Scores assessment show that 222 Thai listed companies averaged 3.6 out of 5, placing them at a Good practice level, with the utilities, healthcare, and oil and gas sectors scoring most strongly. KS said ESG development is reaching a regulatory level that will affect profits and ROIC through a carbon pricing mechanism with a pilot price of 200 baht per tonne of carbon equivalent, a planned emissions trading system trial in 2029-2030, the EU CBAM measure, and the IFRS S1/S2 standards and Thailand Taxonomy. A study of SET100 stocks found that high ESG-rated shares do not always trade at more expensive PER or PBV multiples or post higher EPS growth, but that good ESG enhances investability through liquidity and the shareholding of foreign and institutional investors. The case of DELTA, which was removed from the SETESG index, reflects how money from ESG-linked funds affects short-term price volatility. The 10 standout stocks span five themes: renewable energy business expansion, GULF, BCPG and CKP; green industrial infrastructure, WHA and AMATA; ESG data services and carbon management, DITTO and BBIK; sustainable finance, BAY and TTB; and the circular economy, SCGP.
HoonVision·7hRead more →
2

NESDC expects data centre business control criteria to take effect in mid-October

Danucha Pichayanan, Secretary-General of the National Economic and Social Development Council, in his capacity as a board member and secretary of the committee on policy for the operation of data centre businesses, disclosed that the criteria governing the data centre business are expected to be finalised and begin actual enforcement no later than mid-October, after various agencies submitted their data, covering current service providers, criteria for classifying data centre sizes, and average electricity and water usage. On the electricity criteria, the Ministry of Energy will have to set criteria controlling consumption volumes, with electricity rates to apply specifically to the data centre business group. As for the criteria governing each category of size, operators that meet the industrial-type criteria must be located in designated industrial estate areas, and this must not affect the household sector. He also expressed the view that hyperscale data centres should be set at an electricity usage level of 100 megawatts or more. The clarity of the actual criteria must await the board's consideration. On the timeline, after the deadline, a conclusion is to be reached within one month from the first meeting on 4 September, after which the process of drafting a policy specifically for data centres will begin, and a mechanism must be considered to prevent operations from becoming fragmented. As for which agency will be the host, that must await a further conclusion.
InfoQuest·11hRead more →