National Water Resources Office warns of flash floods September 26-30, 2026, with many provinces nationwide on alert

โดย InfoQuest·TH·Read original
Summary · why it matters

The National Water Resources Office, or ONWR, has issued a warning to monitor areas at risk of flash floods, forest runoff, mudslides and waterlogging from September 26 to 30, 2026, after tracking weather forecasts that show heavy to very heavy rain in many areas, particularly the North, the lower Northeast, the Central region, the West, Bangkok and its vicinity, the East and the South. During September 28 to 30, 2026, rain in the Northeast and the East will begin to ease, while the North, Central region and South will still see heavy rain in some areas on the western side of each region. At present, runoff from the upper Chao Phraya River basin is increasing the volume of water flowing into the basin. ONWR said the at-risk areas requiring monitoring cover the provinces of Mae Hong Son, Tak, Kamphaeng Phet, Phitsanulok, Uthai Thani, Nakhon Sawan, Nakhon Ratchasima, Surin, Sisaket, Chai Nat, Lopburi, Suphan Buri, Saraburi, Pathum Thani, Nonthaburi, Bangkok, Samut Prakan, Kanchanaburi, Ratchaburi, Phetchaburi, Prachuap Khiri Khan, Chachoengsao, Nakhon Nayok, Prachin Buri, Sa Kaeo, Chonburi, Rayong, Chanthaburi, Trat and Narathiwat. Authorities are also to monitor sudden rises in water levels and overtopping of riverbanks in low-lying areas along major rivers and their tributaries, such as the Moei River, the Yuam River, the Wang Thong River, the Sakae Krang River, the Pa Sak River, the Nakhon Nayok River, the Prachin Buri River, Khlong Phra Sathueng and Khlong Phra Prong, the Chanthaburi River, the Trat River, Khlong Bang Saphan, the Sai Buri River and the Kolok River. For the area downstream of Chao Phraya Dam, runoff from the upper basin is expected to increase the volume of water flowing into the Chao Phraya basin, with discharges through Chao Phraya Dam expected to be around 2,000 cubic metres per second, which would affect low-lying areas outside the flood barriers in Chai Nat, Sing Buri, Ang Thong, Phra Nakhon Si Ayutthaya, Pathum Thani and Nonthaburi. The flow through Chao Phraya Dam will be kept at no more than 1,750 cubic metres per second for as long as possible, while water will be diverted into canals on the west and east banks above Chao Phraya Dam and spread into low-lying areas and already-harvested rice fields to reduce downstream impacts. ONWR asked relevant agencies to continuously monitor weather and water conditions, especially in areas with more than 90 millimetres of accumulated rainfall within 24 hours, to inspect and repair riverbank embankments, clear waterway obstructions, and manage water in reservoirs and sluice gates in a coordinated way from upstream to downstream, as well as to prepare flood response plans, personnel and machinery, and to issue advance public warnings so people can evacuate in time.

Theme Impact 1

Related news

2

Government to cover flood relief through end of fiscal 2026, new insurance system starts October 1, 2026

Paradorn Prisananantakul, Minister attached to the Prime Minister's Office, said the government is ready to take responsibility for assisting people affected by flooding during the policy transition period. Through fiscal year 2026, or before October 1, 2026, it is the government's duty to compensate the public using the central budget, and he confirmed that sufficient funds are available. For assistance from fiscal year 2027, or from October 1, 2026 onward, the Cabinet resolved on September 15 to approve the purchase of household insurance for every household nationwide, more than 30 million households, with a total value of 15.5 billion baht. The Office of the Insurance Commission is rushing to sign the policies in time for October 1. The assistance is divided into two parts, totaling 100,000 baht per household: an immediate relief payment of 10,000 baht within 7 days once a province is declared a flood area, and after the water recedes, insurance companies will survey the damage and pay an additional 90,000 baht per household based on actual losses. For agricultural areas, this falls under the Ministry of Agriculture and Cooperatives according to existing disaster relief criteria. Paradorn also said he has instructed the Royal Irrigation Department and relevant agencies to manage the water situation in the central region, which is expected to reach its critical and peak period this week, using a fishbone water management approach that avoids affecting downstream areas too much and delays the release of water into fields where harvesting is not yet complete.
Prachachat·9hRead more →
▲2

Sumitomo Mitsui Banking expands disaster-prevention loans, first in Japan to meet international standard

Sumitomo Mitsui Banking announced on the 25th that it will expand lending for corporate spending on disaster prevention and climate change measures. As natural disasters caused by climate change, such as heavy rain and floods, increase, the bank aims to support investment in flood-proofing buildings, installing emergency power sources, river improvement, cooling equipment, and developing crops suited to climate change. The bank became the first Japanese financial institution to obtain an opinion from the UK-based nonprofit Climate Bonds Initiative, which promotes such investment, stating that its sustainable finance framework conforms to international standards. This makes it easier for companies to show investors that they are working on disaster prevention and climate change measures if they receive loans through the bank's framework. It also signed a memorandum with the Climate Bonds Initiative together with SMBC Nikko Securities to share knowledge on climate-related standards and evaluation methods and expand the supply of funds to the disaster prevention field. Sumitomo Mitsui Financial Group aims to handle 50 trillion yen in sustainable finance by fiscal 2029.
時事通信·12hRead more →
2

Bangkok races to drain main canals ahead of heavy rain on September 24-27; northern runoff not yet critical

Bangkok Governor Chadchart Sittipunt inspected the water situation at the Phra Khanong pumping station on the evening of September 23, 2026, and instructed agencies to prepare for heavy rain between September 24 and 27, which may be heaviest over the weekend. He said the Chao Phraya Dam is currently releasing about 1,700 cubic metres per second, below the critical level of 3,500 cubic metres per second. The water level in the Chao Phraya River stands at about +1.50 to +1.80 metres, while Bangkok's flood barriers are 2.80 metres high, leaving a safe margin. Bangkok will speed up draining water from its main canals, including Lat Phrao, Prem Prachakon, Saen Saep and Prawet Burirom, to push canal levels as low as possible and increase rainwater storage capacity as a monkey-cheek reservoir, and will divert water to Nong Bon Lake, which has a capacity of about 5 million cubic metres, before releasing it into the Chao Phraya River and the Gulf of Thailand through the Phra Khanong pumping station, which has a combined pumping capacity of 205 cubic metres per second. The city is also addressing risk points at mass transit construction sites, such as Khlong Na Song on the Orange Line, where additional pumps have been installed. It is accelerating the demolition of structures encroaching on canal banks, such as the Rong Si community, and dredging in front of the Phra Khanong pumping station to a depth of -4.5 metres. Staff will be stationed at pumping centres, along with mobile pumping trucks, municipal enforcement officers and public service units operating around the clock.
InfoQuest·1dRead more →