Xos IncXOS
▲ PositiveDemandrelevance
White paper identifies 117 MWh daily power demand across LA28 venues, proposing Xos products as solution.

Xos has released a white paper identifying more than 117 MWh of daily venue power demand across over 40 venues and nine geographic zones for the 2028 Olympic and Paralympic Games. The analysis finds that neither diesel generators nor permanent grid connections can satisfy LA28’s twin commitments of 100% renewable electricity at every venue and no new permanent infrastructure. The paper proposes the Xos AC Power Hub and Xos Solar System ecosystem as a mobile, modular alternative that deploys in days and redeploys after the Games. Xos already has eight Xos Hub units deployed with the Los Angeles Department of Water and Power.
Xos IncWhite paper identifies 117 MWh daily power demand across LA28 venues, proposing Xos products as solution.