MARA Holdings IncMARA Holdings is the subject, shifting to AI power infrastructure with a major acquisition.
MARA Holdings is shifting from pure-play Bitcoin mining to providing power infrastructure for AI data centers, a move underscored by its recent acquisition of the Long Ridge Energy & Power facility from FTAI Infrastructure Inc. The 505-megawatt combined-cycle gas plant sits on 1,600 acres with expansion potential beyond 1 gigawatt, and MARA plans to use it to supply reliable, low-cost energy to high-performance computing customers. The company already controls 1.9 gigawatts of power infrastructure and boasts sector-leading energy costs of $0.04 per kilowatt hour at owned sites. Since the trade date referenced in a related portfolio analysis, MARA’s stock has returned 54 percent.
MARA Holdings IncMARA Holdings is the subject, shifting to AI power infrastructure with a major acquisition.
Marathon Digital Holdings IncMARA is pivoting to AI infrastructure, acquiring a gas plant for HPC customers.
FTAI Infrastructure Inc.FTAI Infrastructure sold the Long Ridge facility to MARA, losing a key asset.